{"content":"![](https://akef.com.my/wp-content/uploads/2024/10/rosmaricompletion_featurenews.png)\n\nAfter over a year of dedicated work on fabricating and assembling the topside structure, and mechanical installation, we are proud to announce the successful loadout and sailaway from MMHE Pasir Gudang, Johor on September 26, 2024. This project involved 1300 metric tons of steel, highlighting our commitment to excellence in offshore engineering and construction.\n\n[![](https://akef.com.my/wp-content/uploads/2024/05/rosmaricompletion_1.png)](https://akef.com.my/wp-content/uploads/2024/05/rosmaricompletion_1.png)\n\n[![](https://akef.com.my/wp-content/uploads/2024/10/rosmari10-1.png)](https://akef.com.my/wp-content/uploads/2024/10/rosmari10-1.png)\n\n[![](https://akef.com.my/wp-content/uploads/2024/10/rosmari5.png)](https://akef.com.my/wp-content/uploads/2024/10/rosmari5.png)\n\n[![](https://akef.com.my/wp-content/uploads/2024/10/rosmari2.png)](https://akef.com.my/wp-content/uploads/2024/10/rosmari2.png)\n\n[![](https://akef.com.my/wp-content/uploads/2024/10/rosmari4.png)](https://akef.com.my/wp-content/uploads/2024/10/rosmari4.png)\n\n[![](https://akef.com.my/wp-content/uploads/2024/10/rosmari6.png)](https://akef.com.my/wp-content/uploads/2024/10/rosmari6.png)\n\n[![](https://akef.com.my/wp-content/uploads/2024/10/rosmari7.png)](https://akef.com.my/wp-content/uploads/2024/10/rosmari7.png)\n\n[![](https://akef.com.my/wp-content/uploads/2024/10/rosmari9.png)](https://akef.com.my/wp-content/uploads/2024/10/rosmari9.png)","original_url":"https://akef.com.my/","word_count":63,"key_claims":["Asman Kadir Engineering fabrication","Topside structure assembly","Over 1 year dedicated work"],"content_summary":"Asman Kadir Engineering fabricates and assembles topside structures.","expertise_signals":["Engineering fabrication"]}